New Steel Protection company works on:
Ispection & Certification of passive fire protection
Our company undertakes ispection by giving final certification after checking the passive fire protection of metal buildings (for applied fire proofing paint and vermiculite.) Undertaking all the necessary and legal procedures such as checking the documents of the proposed passive system, checking the study according to the certificates of the material and an on-site inspection of the placement of the proposed system either at the site or at the factory.
Our company grants passive fire protection (fireproofing) certificates following work to change use in existing premises such as warehouses, buildings etc. according to the PD. 71/88 for property categories A to I and with a fire resistance index of R30 to R120.
FLOOR SYSTEM OF DEVELOPED POLYMERS
New series of innovative Aurora Flooring System self-leveling flooring products, solvent-free, sophisticated polymers for medium circulation, unique in their effect, seamless and with high mechanical strength.
It comes in all shades of RAL, with a combination of dyes and metal pearls. It has the ability to change colors depending on the lighting of the room. It gives the form of liquid glass, offering a unique and unique end result in every application for each customer.
It is applied on glass, wood, parquet, industrial flooring, marble, tile, mosaic etc.
No decommissioning of the existing patch is required.
Suitable for all areas such as residences, business premises, offices, shops, shopping centers.
See more here
Project: Pylaia Depot, Thessaloniki Metro
Start of project October 2017 and completion the project April 2018 Was applied system of passive fire with fire proofing paint in 8.500 m2
Project: Lidl Ag. Dimitrios
Start and completion of project September 2017 Was applied system of passive fire with fire proofing paint in 1.000 m2
Project: Port Plaza Piraeus
Start project march 2017 and completion of project September 2017 Was applied system of passive fire with fire proofing paint in the three-floor building at 6,500 m2
Project: "Stelios Ioannou" Learning Resource Centre Dome In Cyprus
Signing contract with ANRO Spanish Company. Start project November 2016 and completion of project February 2017 Was applied with system anti- corrosion paint protection of all the metallic organizer which appears to the dome in 6.000 m2